Rural electrification of Clonaslee, Co Laois in 1948

Area: Clonaslee Started: December 1947 Finished: August 1948 Poles used: 891 Line used (km): 73 Premises connected: 45 The figures above were sourced from our
_Ballyduff-map-waterford

Rural electrification of Ballyduff, Co Waterford in 1948

Area: Ballyduff Started: December 1947 Finished: December 1948 Poles used: 1125 Line used (km): 102 Premises connected: 210 The figures above were sourced from
Glenamaddy-map-GALWAY-big

Rural electrification of Glenamaddy, Co Galway in 1951

Area: Glenamaddy Started: April 1950 Finished: April 1951 Poles used: 1801 Line used (km): 134 Premises connected: 497 The figures above were
Inniscarra-map-2-cork

Rural electrification of Inniscarra, Co. Cork in 1948

Area: Inniscarra Started: December 1947 Finished: April 1948 Poles used: 2132 Line used (km): 141 Premises connected: 230 The figures above were sourced from
Bansha-map-limerick

Rural electrification of Bansha, Co Tipperary in 1948

Area: Bansha Started: December 1947 Finished: November 1948 Poles used: 1613 Line used (km): 121 Premises connected: 423 The figures
Silvermines-Map-limerick

Rural electrification of Silvermines, Co Tipperary in 1950

Area: Silvermines Started: November 1949 Finished: March 1950 Poles used: 817 Line used (km): 72 Premises connected: 255 The figures
KilfinnaneMartinstown-Map-limerick

Rural electrification of Kilfinnane/Martinstown, Co Limerick in 1949

Area: Kilfinnane/Martinstown Started: August 1948 Finished: May 1949 Poles used: 1089 Line used (km): 81 Premises connected: 284 The figures above were sourced from
Rahan-Map-athlone-big

Rural electrification of Rahan, Co Offaly in 1953

Area: Rahan Started: June 1952 Finished: February 1953 Poles used: 900 Line used (km): 80 Premises connected: 280 The figures above
Very Rev. P. Norris blessing the new mineral water factory in Kilmessan December 1949

Tara (Killmessan) Co. Meath 1950

Area: Tara (Kilmessan) Started: July 1949 Finished: April 1950 Poles Erected: 1400 Km. of line used: 112 Premises Connected: 235 The