switch on at Blackwater Co. Wexford 1955

Rural electrification of Blackwater, Co Wexford in 1955

Key Rural Electrification Facts: Surveyed: September 1953 Started: March 1955 Completed: September 1955 SQ Miles: 33 No. Consumers Accepted: 327
Kilbride-map-2-dublin

Rural electrification of Kilbride, Co Wicklow in 1948

Area: Kilbride Started: December 1947 Finished: May 1948 Poles used: 1011 Line used (km): 92 Premises connected: 235 The figures above were sourced from our
Rural electrification of Blackwater, Co Wexford in 1955

Rural electrification of Blackwater, Co Wexford in 1955

A 1955 pop up shop & some fabulous photos from the Switch On ceremony.