Shannon Scheme Photo Gallery By esbarchives / May 3, 2016 / Leave a comment Spiral casing of 36000 turbine may 1929 Early construction site 1926 Installation of penstocks Working on the penstocks 1928 Working on the penstocks 1928 Working on the penstocks 1928 Construction work for Power Station Final preparation to penstock III in June 1929 Preparing the Embankments Working on Embankments Truck bringing material from Gernany December 1928 Unloading at Limerick docks Motor section on board S.S. Ambria on arrival at Limerick docks May 1929 Steel frame construction 1929 Site under construction December 1928 View of intake building May 1929 Construction of Spillway Navigation Lock Cloonlara Bridge View of railway system Bank building machine Bucket excavator at work Pontoon at work Drehstorm generator Concrete Factory Installation of Turbine Main control room at Ardnacrusha November 1929 Transmision compound Overhead Gantry System Dredger at work View of Turbine Hall Official opening Aerial view of Parteen Weir View of Power Station Aerial view of Power Station View from tailrace Map of Shannon Scheme Transmission system Diver ready for work Camp site and living quarters Irish workers camp Dormitory in Irish camp German camp Last day for German workers FacebookTwitterMoreEmailTumblrRedditLinkedInPinterestWhatsAppPrintLike this:Like Loading... You may also like...